TRAM 015

From ACT Bus Fleetwiki
Revision as of 19:37, 19 August 2022 by Barry Drive (talk | contribs) (New)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Tram 015
Chassis CAF Urbos 100
Depot --
Status Ordered
Delivered --
Entered Service --
Build Date --
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.

Notes

  • Tram 015 will be the first of five new trams ordered for Stage 2B of the Canberra Light Rail line.
  • It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.