Difference between revisions of "TRAM 002"

From ACT Bus Fleetwiki
Jump to: navigation, search
m (Text replacement - "link= [4] link= [2] link= <!-- link= -->" to "link=² link= link= link=⁴ ")
(Tags: Mobile edit, Mobile web edit)
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
|-
 
|-
 
| '''Status'''
 
| '''Status'''
| Delivered (6 April 2018)
+
| In service
 +
|-
 +
| '''Delivered'''
 +
| 6 April 2018
 
|-
 
|-
 
| valign=top | '''Entered Service'''
 
| valign=top | '''Entered Service'''
| --
+
| 20 April 2019
|-
+
| valign=top | '''Desto Equipment'''
+
| Hanover LED
+
 
|-
 
|-
 
| valign-top | '''Serial Number'''
 
| valign-top | '''Serial Number'''
Line 33: Line 33:
 
[[TRAM 001|<< prev]] | [[TRAM 003|next >>]]
 
[[TRAM 001|<< prev]] | [[TRAM 003|next >>]]
  
[[File:Wifi.jpg|25px|link=]]
+
[[File:WC.jpg|25px|link=]]²
 
[[File:CC.jpg|25px|link=]]
 
[[File:CC.jpg|25px|link=]]
[[File:WC.jpg|25px|link=]] [2]  
+
[[File:Wifi.jpg|25px|link=]]
[[File:Bike.jpg|30px|link=]] [4]
+
[[File:Bike.jpg|25px|link=]]
 +
 
  
 
Tram 002 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) 100% low floor five-module bidirectional tram.
 
Tram 002 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) 100% low floor five-module bidirectional tram.
Line 49: Line 50:
 
[[Category:CAF Urbos 100]]
 
[[Category:CAF Urbos 100]]
 
[[Category:Mitchell Tram Depot]]  
 
[[Category:Mitchell Tram Depot]]  
[[Category:Trams Not Yet In Service]]
 
 
[[Category:Delivered April 2018]]
 
[[Category:Delivered April 2018]]
 
[[Category:YouTube]]
 
[[Category:YouTube]]

Latest revision as of 10:21, 19 November 2019

T002.jpg
Tram 002
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 6 April 2018
Entered Service 20 April 2019
Serial Number --
Build Date Jan 2018
Capacity 66 seated, 207 total
Gallery Album Tram 002

<< prev | next >>

WC.jpg² CC.jpg Wifi.jpg Bike.jpg


Tram 002 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) 100% low floor five-module bidirectional tram.

Notes

  • It was transported from Santander, Spain to Port Kembla, NSW on board Cattleya Ace arriving on 31 March 2018.

Media