TRAM 201

From ACT Bus Fleetwiki
Jump to: navigation, search
T201.jpg
Tram 201
Chassis CAF Urbos 100
Depot Mitchell
Status Delivered (13 December 2017)
Entered Service --
Desto Equipment Hanover LED
Serial Number --
Build Date Nov 2017
Capacity 66 seated, 207 total
Gallery Album Tram 201

| next >>

Wifi.jpg CC.jpg WC.jpg [2] Bike.jpg [4]

Tram 201 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • Fleet number assumed at this stage - to be confirmed later.
  • Tram 201 is the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail.
  • It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017.

Media