TRAM 019: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
(New)
 
(Image)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
! colspan="3" align=center | <!-- insert photo here [[File:T0--.jpg]] -->
! colspan="3" align=center | [[File:T019.jpg|link=]]
|-
|-
! colspan="3" align=center bgcolor=#CCCCFF| Tram 019
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 019</big>
|-
|-
| valign=top | '''Chassis'''
| valign=top | '''Chassis'''
Line 8: Line 8:
|-
|-
| valign=top | '''Depot'''  
| valign=top | '''Depot'''  
<!-- | [[:Category:Mitchell Tram Depot|Mitchell]] -->
| [[:Category:Mitchell Tram Depot|Mitchell]]
| --
|-
|-
| '''Status'''
| '''Status'''
| Ordered
| In service
|-
|-
| '''Delivered'''
| '''Delivered'''
| --
| 17 October 2024
|-
|-
| '''Entered Service'''
| '''Entered Service'''
| --
| 1 April 2025
|-
|-
| valign=top | '''Build Date'''
| valign=top | '''Build Date'''
| --
| 2024
|-
|-
| valign=top | '''Capacity'''
| valign=top | '''Capacity'''
Line 27: Line 26:
|-
|-
| valign=top | '''Gallery Album'''
| valign=top | '''Gallery Album'''
| -- <!--  [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-019 Tram 019] -->
| [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-019 Tram 019]
|}
|}
[[TRAM 018|<< prev]] |  
[[TRAM 018|<< prev]] |  
Line 33: Line 32:
[[File:WC.jpg|25px|link=]]²
[[File:WC.jpg|25px|link=]]²
[[File:CC.jpg|25px|link=]]
[[File:CC.jpg|25px|link=]]
[[File:Wifi.jpg|25px|link=]]
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴


Tram 019 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024/25.
Tram 019 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.


==Notes==
==Notes==
* Tram 019 will be the last of five new trams ordered for Stage 2A of the Canberra Light Rail line.
<!--
* It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.
* Tram 019 was transported from Santander, Spain aboard Höegh (???) and arrived at Port Kembla on (???) 2024. -->
* Tram 019 is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* Although numerically the last of the five new CAF Urbos trams ordered for Stage 2A of the Canberra Light Rail line, Tram 019 was the fourth to be delivered and put into service.  


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Canberra Metro Trams]]
[[Category:Mitchell Tram Depot]]
[[Category:Delivered October 2024]]

Latest revision as of 18:56, 13 April 2025

Tram 019
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 17 October 2024
Entered Service 1 April 2025
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album Tram 019

<< prev |

²

Tram 019 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • Tram 019 is fitted with on-board batteries, enabling it to operate wire-free for short distances.
  • Although numerically the last of the five new CAF Urbos trams ordered for Stage 2A of the Canberra Light Rail line, Tram 019 was the fourth to be delivered and put into service.