TRAM 003: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (Add image) |
Barry Drive (talk | contribs) (Resumed service) |
||
| (12 intermediate revisions by 2 users not shown) | |||
| Line 2: | Line 2: | ||
! colspan="3" align=center |[[File:T003-AOA.jpg|link=]] | ! colspan="3" align=center |[[File:T003-AOA.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003 | ! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 003</big> | ||
|- | |- | ||
| valign=top | '''Chassis''' | | valign=top | '''Chassis''' | ||
| Line 29: | Line 29: | ||
|- | |- | ||
| valign=top | '''Gallery Album''' | | valign=top | '''Gallery Album''' | ||
| [http://www.actbus.net/gallery/ | | [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-003 Tram 003] | ||
|} | |} | ||
[[TRAM 002|<< prev]] | [[TRAM 004|next >>]] | [[TRAM 002|<< prev]] | [[TRAM 004|next >>]] | ||
| Line 35: | Line 35: | ||
[[File:WC.jpg|25px|link=]]² | [[File:WC.jpg|25px|link=]]² | ||
[[File:CC.jpg|25px|link=]] | [[File:CC.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
[[File:AOA.png | [[File:AOA.png|link=:Category:Current AOA Trams]] | ||
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for ''' | Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for '''Built for CBR (ACT Government)'''. | ||
==Notes== | ==Notes== | ||
* It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018. | * It was transported from Santander, Spain to Port Kembla, NSW on board ''Höegh Target'' arriving on 30 April 2018. | ||
* It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av. | * It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av. | ||
* On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection. | |||
** [http://www.onsceneact.com.au/index.php/511-car-and-light-rail-vehicle-collide-in-gungahlin On Scene ACT] | |||
* Tram 003 was out of service between 4 February and 23 March 2026 for installation of on-board batteries. | |||
==All Over Advertising== | ==All Over Advertising== | ||
[[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to current'' | * [[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021'' | ||
* [[File:Photo.png|link=]] '''"Built for CBR" (ACT Government)''' – ''4 May 2024 to June 2024'' | |||
* [[File:Photo.png|link=]] '''University of New South Wales''' – ''September 2024 to November 2024'' | |||
* '''"Built for CBR" (ACT Government)''' – ''February 2026 to current'' | |||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] | ||
Latest revision as of 00:40, 27 March 2026
| ||
|---|---|---|
| Tram 003 | ||
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | 4 May 2018 | |
| Entered Service | 20 April 2019 | |
| Build Date | Feb 2018 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | Tram 003 | |
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for Built for CBR (ACT Government).
Notes
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
- It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
- On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.
- Tram 003 was out of service between 4 February and 23 March 2026 for installation of on-board batteries.
All Over Advertising
Canberra Institute of Technology – 24 May 2021 to 13 November 2021
"Built for CBR" (ACT Government) – 4 May 2024 to June 2024
University of New South Wales – September 2024 to November 2024
- "Built for CBR" (ACT Government) – February 2026 to current
