TRAM 003: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (Add image) |
Barry Drive (talk | contribs) (AOA removed L) |
||
| Line 36: | Line 36: | ||
[[File:CC.jpg|25px|link=]] | [[File:CC.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
[[File:AOA.png|link=:Category:Current AOA Trams]] | <!-- [[File:AOA.png|link=:Category:Current AOA Trams]] --> | ||
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for '''University of New South Wales'''. | Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | ||
<!-- It is currently in an all over advertising wrap for '''University of New South Wales'''. --> | |||
==Notes== | ==Notes== | ||
| Line 51: | Line 52: | ||
* [[File:Photo.png|link=]] '''"Built for CBR" (ACT Government)''' – ''4 May 2024 to June 2024'' | * [[File:Photo.png|link=]] '''"Built for CBR" (ACT Government)''' – ''4 May 2024 to June 2024'' | ||
* [[File:Photo.png|link=]] '''University of New South Wales''' – ''September 2024 to | * [[File:Photo.png|link=]] '''University of New South Wales''' – ''September 2024 to November 2024'' | ||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] | ||
| Line 57: | Line 58: | ||
[[Category:Mitchell Tram Depot]] | [[Category:Mitchell Tram Depot]] | ||
[[Category:Delivered May 2018]] | [[Category:Delivered May 2018]] | ||
[[Category: | [[Category:Former AOA Trams]] | ||
Revision as of 22:22, 20 November 2024
| ||
|---|---|---|
| Tram 003 | ||
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | 4 May 2018 | |
| Entered Service | 20 April 2019 | |
| Build Date | Feb 2018 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | Tram 003 | |
²
⁴
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
- It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
- On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.
All Over Advertising
Canberra Institute of Technology – 24 May 2021 to 13 November 2021
"Built for CBR" (ACT Government) – 4 May 2024 to June 2024
University of New South Wales – September 2024 to November 2024
