TRAM 002: Difference between revisions
Jump to navigation
Jump to search
en>Barry m (Text replacement - "25px|link= [4] 25px|link= [2] 25px|link= <!-- 25px|link= -->" to "25px|link=² 25px|link= 25px|link= 25px|link=⁴ ") |
m (1 revision imported) |
(No difference)
| |
Revision as of 03:38, 1 April 2021
| ||
|---|---|---|
| Tram 002 | ||
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | 6 April 2018 | |
| Entered Service | 20 April 2019 | |
| Serial Number | -- | |
| Build Date | Jan 2018 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | Tram 002 | |
²
⁴
Tram 002 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) 100% low floor five-module bidirectional tram.
Notes
- It was transported from Santander, Spain to Port Kembla, NSW on board Cattleya Ace arriving on 31 March 2018.
