TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (Delivered (tbc)) |
Barry Drive (talk | contribs) (In service) |
||
| Line 11: | Line 11: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | In service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| Line 17: | Line 17: | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
| | | ~23 December 2024 | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
| Line 34: | Line 34: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram | Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | ||
==Notes== | ==Notes== | ||
| Line 43: | Line 43: | ||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category:Mitchell Tram Depot]] | [[Category:Mitchell Tram Depot]] | ||
[[Category:Canberra Metro Trams]] | |||
[[Category:Delivered August 2024]] | [[Category:Delivered August 2024]] | ||
Revision as of 17:13, 22 December 2024
| Tram 015 | ||
|---|---|---|
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | 23 August 2024 | |
| Entered Service | ~23 December 2024 | |
| Build Date | 2024 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | -- | |
²
⁴
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
- It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.