TRAM 009: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (AOA removed) |
Barry Drive (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center |[[File:T009 | ! colspan="3" align=center |[[File:T009.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 009</big> | ! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 009</big> | ||
| Line 11: | Line 11: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| In | | Not In Service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| Line 37: | Line 37: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 009 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram | Tram 009 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram – ''not currently in service'' | ||
==Notes== | ==Notes== | ||
* It was transported from Santander, Spain to Port Kembla, NSW – believed to be on board ''Höegh Copenhagen'' arriving on 8 July 2018. | * It was transported from Santander, Spain to Port Kembla, NSW – believed to be on board ''Höegh Copenhagen'' arriving on 8 July 2018. | ||
* Tram 009 was the first to depart Alinga Street on the first day of service, 20 April 2019. | * Tram 009 was the first to depart Alinga Street on the first day of service, 20 April 2019. | ||
<!-- removed from service for battery retro-fit ~12 March 2026 --> | |||
==All Over Advertising== | ==All Over Advertising== | ||
Latest revision as of 20:24, 16 March 2026
| ||
|---|---|---|
| Tram 009 | ||
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | Not In Service | |
| Delivered | July 2018 | |
| Entered Service | 20 April 2019 | |
| Build Date | Apr 2018 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | Tram 009 | |
²
⁴
Tram 009 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram – not currently in service
Notes
- It was transported from Santander, Spain to Port Kembla, NSW – believed to be on board Höegh Copenhagen arriving on 8 July 2018.
- Tram 009 was the first to depart Alinga Street on the first day of service, 20 April 2019.
All Over Advertising
ActewAGL – 5 May 2021 to 17 October 2021
"Stop it or cop it" (ACT Government) – March 2024 to 20 May 2024
UniSuper – mid July 2024 to 5 December 2024
Aware Super – 22 April 2025 to ~11 July 2025
