TRAM 007: Difference between revisions
Jump to navigation
Jump to search
en>Barry m (Text replacement - "25px|link= [4] 25px|link= [2] 25px|link= <!-- 25px|link= -->" to "25px|link=² 25px|link= 25px|link= 25px|link=⁴ ") |
m (1 revision imported) |
(No difference)
| |
Revision as of 03:38, 1 April 2021
| ||
|---|---|---|
| Tram 007 | ||
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | June 2018 | |
| Entered Service | 20 April 2019 | |
| Serial Number | -- | |
| Build Date | Apr 2018 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | Tram 007 | |
²
⁴
Tram 007 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- It was transported from Santander, Spain to Port Kembla, NSW – believed to be on board Höegh Traveller arriving on 13 June 2018.
