TRAM 015
| Tram 015 | ||
|---|---|---|
| Chassis | CAF Urbos 100 | |
| Depot | Mitchell | |
| Status | In service | |
| Delivered | 23 August 2024 | |
| Entered Service | ~23 December 2024 | |
| Build Date | 2024 | |
| Capacity | 66 seated, 207 total | |
| Gallery Album | -- | |
²
⁴
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
- It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.