TRAM 003: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
(Add image)
(AOA removed)
Line 1: Line 1:
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
! colspan="3" align=center |[[File:T003-AOA.jpg|link=]]
! colspan="3" align=center |[[File:T003.jpg|link=]]
|-
|-
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003
Line 37: Line 37:
[[File:Wifi.jpg|25px|link=]]
[[File:Wifi.jpg|25px|link=]]
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴
[[File:AOA.png|25px|link=:Category:Current AOA Trams]]


Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for '''Canberra Institute of Technology'''.
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.


==Notes==
==Notes==
Line 46: Line 45:


==All Over Advertising==
==All Over Advertising==
[[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to current''
[[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021''


[[Category:Canberra Metro Trams]]
[[Category:Canberra Metro Trams]]
Line 52: Line 51:
[[Category:Mitchell Tram Depot]]  
[[Category:Mitchell Tram Depot]]  
[[Category:Delivered May 2018]]
[[Category:Delivered May 2018]]
[[Category:Current AOA Trams]]
[[Category:Former AOA Trams]]

Revision as of 23:52, 12 November 2021

Tram 003
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 4 May 2018
Entered Service 20 April 2019
Build Date Feb 2018
Capacity 66 seated, 207 total
Gallery Album Tram 003

<< prev | next >>

²

Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
  • It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.

All Over Advertising

Canberra Institute of Technology24 May 2021 to 13 November 2021