Monaro Highway Fyshwick Duplication

Started by Sir Pompously, November 06, 2010, 08:49:59 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Sir Pompously

As posted in the Majura Parkway thread, signage has been placed up (Albeit small) for the duplication but no website as of yet.

Now all they need to do is add another lane from Fyshwick Interchange to Isabella Drive in both directions, and duplicate Isabella Drive from Chisholm to Drakeford (Or atleast Ashley drive) to try and relieve some pressure during peak hours (A Study into Ashley Drive duplication was announced to be conducted).

Sir Pompously

Looks as though construction is progressing really well with this stretch of road.

Main section between the two bridges, and either side of each bridge has been tarred. Railway bridge is almost complete and the Canberra Ave bridge is getting there. Street lighting is also up which is a good sign work is going really well.

Can't wait till it opens up!

ajw373

Anyone know why they had to replace the road bridge over the railway line? Considering it wasn't built all that long ago (in the grand scheme of things), cannot see why it had to be replaced.