Route B (1948): Difference between revisions

From ACT Bus Network Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 38: Line 38:
=== Notes ===
=== Notes ===


* From 1948 to 1955, services operated in combination with up to three other services to form one route.  
* From 1948 to 1957, services operated in combination with up to three other services to form one route.
* Route B provided a link between southside and northside services, indicating that they crossed the Molonglo River via Commonwealth Ave, whereas services that crossed via the Lennox Crossing used [[Route A (1948)]]
* Route B provided a link between southside and northside services, indicating that they crossed the Molonglo River via Commonwealth Ave, whereas services that crossed via the Lennox Crossing used [[Route A (1948)]]
* Route B did not run in its own right - it always operated in combination with another route component.  
* Route B did not run in its own right - it always operated in combination with another route component.  

Latest revision as of 15:47, 26 July 2025

Route B was a connector service that ran between Albert Hall and the City

Start Albert Hall
End City Interchange
Via Commonwealth Ave
Start date March 1948
End date October 1957
Route Type Connector
Days of operation Seven days
Preceded by
Succeeded by

Directions

Albert Hall - Commonwealth Ave - City

Notes

  • From 1948 to 1957, services operated in combination with up to three other services to form one route.
  • Route B provided a link between southside and northside services, indicating that they crossed the Molonglo River via Commonwealth Ave, whereas services that crossed via the Lennox Crossing used Route A (1948)
  • Route B did not run in its own right - it always operated in combination with another route component.
  • For further details, refer to Network 1948
  • Route B did not operate between 17 and 22 March 1951, during a temporary closure of the Bridge, with all services diverted via Route A.