Route R8 (2019): Difference between revisions

From ACT Bus Network Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 30: Line 30:
| valign=top | '''Succeeded by'''
| valign=top | '''Succeeded by'''
| --
| --
|-
| '''Timetable link'''
|
|}
|}



Revision as of 18:25, 17 November 2025

Route R8 (2019)
Start Belconnen Interchange
End Gungahlin Interchange
Via Gundaroo Drive
Start date 29 April 2019
End date --
Route Type Rapid
Days of operation Seven days
Preceded by Route 250 (2014), Route 954 (2014)
Succeeded by --

Route R8 is a rapid service that runs between Belconnen and Gungahlin Interchanges.

Directions

April 2019 to Present

Northbound

Cohen St Interchange Platform 3 (C) Cohen (L) Lathlain (R) Westfield Interchange (C) Cohen to Belconnen Interchange Platform 1 (C) Emu (L) Aikman (L) Ginninderra (R) Gundaroo (R) Anthony Rolfe (R) Gozzard (L) Ernst Cavanagh (R) Gungahlin Place Platform 3

Southbound

Gungahlin Place Platform 4 (L) Ernst Cavanagh (R) Gozzard (L) Anthony Rolfe (L) Gundaroo (L) Ginninderra (R) Aikman (R) Emu (C) Belconnen Interchange (C) Cohen to Westfield interchange (L) Lathlain (R) Cohen to Cohen St Interchange