Route R3 (2019): Difference between revisions

From ACT Bus Network Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:
|-
|-
| valign="top" | '''Start'''
| valign="top" | '''Start'''
| Spence Terminus
| Spence Terminus (2019-26)<br>Belconnen Interchanges (2026 - present)
|-
|-
| valign="top" | '''End'''  
| valign="top" | '''End'''  
Line 29: Line 29:
|-
|-
| valign=top | '''Succeeded by'''
| valign=top | '''Succeeded by'''
| [[Route 013 (2026)]]
| [[Route 013 (2026)]] (Belc-Spence leg)
|}
|}


Route R3 is a Rapid service that operates between Spence Terminus and Canberra Airport, via Belconnen and City Interchanges. From February 2026, it will operate between Belconnen and the Airport only.  
Route R3 is a Rapid service that operates between Belconnen and Canberra Airport, via City Interchange.  
=== Directions ===
=== Directions ===


==== 2 February 2026 onwards ====
==== 2 February 2026 to Present ====


===== Inbound =====
===== Inbound =====
Line 72: Line 72:
* Services to Spence temporarily diverted via George Tyson Dr and Brindabella Cct between CBR Airport and Brindabella Park during late 2019/early 2020
* Services to Spence temporarily diverted via George Tyson Dr and Brindabella Cct between CBR Airport and Brindabella Park during late 2019/early 2020
* The route was modified through the City from 5 January to 1 February 2026, due to construction of Light Rail Stage 2A.
* The route was modified through the City from 5 January to 1 February 2026, due to construction of Light Rail Stage 2A.
* The route will be modified from 2 February 2026 to operate only between Belconnen and the Airport, with the Spence to Belconnen leg replaced by [[Route 013 (2026)]].This change is expected to remain in place for the duration of the Commonwealth Avenue Bridge Renewal Project.
* The route was modified from 2 February 2026 to operate only between Belconnen and the Airport, with the Spence to Belconnen leg replaced by [[Route 013 (2026)]].This change is expected to remain in place for the duration of the Commonwealth Avenue Bridge Renewal Project.


[[Category:Current Transport Canberra Routes]]
[[Category:Current Transport Canberra Routes]]
Line 84: Line 84:
[[Category:Barton]]
[[Category:Barton]]
[[Category:Canberra Airport]]
[[Category:Canberra Airport]]
[[Category:Upcoming route changes]]

Revision as of 22:33, 1 February 2026

Route R3
Start Spence Terminus (2019-26)
Belconnen Interchanges (2026 - present)
End Canberra Airport
Via Florey, Belconnen, City, Russell
Start date 29 April 2019
End date Current
Route Type Rapid
Days of operation Seven days
Preceded by Route 011 (2014), Route 011A (2017),
Route 015 (1999), Route 315 (1999),
Route 714 (2014), Route 906 (2006)
Succeeded by Route 013 (2026) (Belc-Spence leg)

Route R3 is a Rapid service that operates between Belconnen and Canberra Airport, via City Interchange.

Directions

2 February 2026 to Present

Inbound

Cohen St Interchange Platform 3 (C) Cohen (L) Lathlain (R) Westfield interchange (C) Cohen to Belconnen Interchange Platform 1 (R) Eastern Valley (L) College (R) Haydon (L) Belconnen (C) Barry (R) Kingsley (L) Rimmer (R) Marcus Clarke (L) Alinga to City Interchange Platform 4 (R) East (L) London (L) Constitution (R) Reg Saunders (L) Russell (L) Morshead (C) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Terminal (C) Terminal to Canberra Airport Arrivals

Outbound

Canberra Airport (L) George Tyson (C) George Tyson (C) Brindabella (R) Brindabella (L) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Pialligo (C) Morshead (R) Russell (R) Reg Saunders (L) Constitution (R) London (R) East (L) Alinga to City Interchange Platform 1 (R) Marcus Clarke (L) Rimmer (R) Kingsley (L) Barry (C) Belconnen (R) Haydon (L) College (R) Eastern Valley (L) Emu to Belconnen interchange Platform 4 (C) Cohen to Westfield Interchange (L) Lathlain (R) Cohen to Cohen St Interchange

4 January 2026 to 1 February 2026

Inbound

Spence Terminus (L) Copland (L) Owen Dixon (L) Clarey (L) Kingsford Smith (L) Baddeley (L) Alpen (R) Copland (C) John Cleland (R) Coulter (L) Nettlefold (L) Cohen to Cohen St Interchange Platform 3 (L) Lathlain (R) Westfield interchange (C) Cohen to Belconnen Interchange Platform 1 (R) Eastern Valley (L) College (R) Haydon (L) Belconnen (C) Barry (R) Kingsley (L) Rimmer (C) Rudd (C) Bunda (R) Mort (C) East (L) London (L) Constitution (R) Reg Saunders (L) Russell (L) Morshead (C) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Terminal (C) Terminal to Canberra Airport Arrivals

Outbound

Canberra Airport (L) George Tyson (C) George Tyson (C) Brindabella (R) Brindabella (L) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Pialligo (C) Morshead (R) Russell (R) Reg Saunders (L) Constitution (R) London (R) East (C) Mort (L) Bunda (C) Rudd (L) Moore (R) Alinga (R) Marcus Clarke (L) Rimmer (R) Kingsley (L) Barry (C) Belconnen (R) Haydon (L) College (R) Eastern Valley (L) Emu to Belconnen interchange Platform 4 (C) Cohen to Westfield Interchange (L) Lathlain (R) Cohen to Cohen St Interchange Platform 6 (R) Nettlefold (R) Coulter (L) John Cleland (R) Copland (L) Alpen (R) Baddeley (R) Kingsford Smith (R) Clarey (R) Owen Dixon (R) Copland (R) Spence Terminus

April 2019 - 4 January 2026

Inbound

Spence Terminus (L) Copland (L) Owen Dixon (L) Clarey (L) Kingsford Smith (L) Baddeley (L) Alpen (R) Copland (C) John Cleland (R) Coulter (L) Nettlefold (L) Cohen to Cohen St Interchange Platform 3 (L) Lathlain (R) Westfield interchange (C) Cohen to Belconnen Interchange Platform 1 (R) Eastern Valley (L) College (R) Haydon (L) Belconnen (C) Barry (R) Kingsley (L) Rimmer (R) Marcus Clarke (L) Alinga to City Interchange Platform 4 (R) East (L) London (L) Constitution (R) Reg Saunders (L) Russell (L) Morshead (C) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Terminal (C) Terminal to Canberra Airport Arrivals

Outbound

Canberra Airport (L) George Tyson (C) George Tyson (C) Brindabella (R) Brindabella (L) Pialligo (L) Molonglo (L) Molonglo (C) Brindabella (C) Rogan (L) Terminal (R) Pialligo (C) Morshead (R) Russell (R) Reg Saunders (L) Constitution (R) London (R) East (L) Alinga to City Interchange Platform 1 (R) Marcus Clarke (L) Rimmer (R) Kingsley (L) Barry (C) Belconnen (R) Haydon (L) College (R) Eastern Valley (L) Emu to Belconnen interchange Platform 4 (C) Cohen to Westfield Interchange (L) Lathlain (R) Cohen to Cohen St Interchange Platform 6 (R) Nettlefold (R) Coulter (L) John Cleland (R) Copland (L) Alpen (R) Baddeley (R) Kingsford Smith (R) Clarey (R) Owen Dixon (R) Copland (R) Spence Terminus

Initial proposal

Inbound

Spence Terminus (L) Copland (L) Owen Dixon (L) Clarey (L) Kingsford Smith (L) Baddeley (L) Alpen (R) Copland (C) John Cleland (R) Coulter (L) Nettlefold (L) Cohen to Cohen St Interchange (L) Lathlain (R) Westfield interchange (C) Cohen to Belconnen Interchange (R) Eastern Valley (L) College (R) Haydon (L) Belconnen (C) Barry (R) Kingsley (L) Rimmer (R) Marcus Clarke (L) Alinga to City Interchange (R) East (L) London (L) Constitution (R) Reg Saunders (L) Russell (L) Morshead (C) Pialligo (L) Terminal to Canberra Airport

Outbound

Canberra Airport (C) Terminal (R) Pialligo (C) Morshead (R) Russell (R) Reg Saunders (L) Constitution (R) London (R) East (L) Alinga to City Interchange (R) Marcus Clarke (L) Rimmer (R) Kingsley (L) Barry (C) Belconnen (R) Haydon (L) College (R) Eastern Valley (L) Emu to Belconnen interchange (C) Cohen to Westfield Interchange (L) Lathlain (R) Cohen to Cohen St Interchange (R) Nettlefold (R) Coulter (L) John Cleland (R) Copland (L) Alpen (R) Baddeley (R) Kingsford Smith (R) Clarey (R) Owen Dixon (R) Copland (R) Spence Terminus

Notes

  • The 2017-20 Rapid Network proposal featured the Belconnen to Airport leg, branded as Yellow Rapid, and planned for introduction in 2020. Route R3 would be introduced in 2019, and extended to Spence.
  • The initial proposed route omitted Brindabella Park
  • Services to Spence temporarily diverted via George Tyson Dr and Brindabella Cct between CBR Airport and Brindabella Park during late 2019/early 2020
  • The route was modified through the City from 5 January to 1 February 2026, due to construction of Light Rail Stage 2A.
  • The route was modified from 2 February 2026 to operate only between Belconnen and the Airport, with the Spence to Belconnen leg replaced by Route 013 (2026).This change is expected to remain in place for the duration of the Commonwealth Avenue Bridge Renewal Project.