BUS 150 (1) and TRAM 001: Difference between pages
(Difference between pages)
m (Text replacement - "gallery/ACTION-Buses-Disposals/AEC-Swift" to "gallery-former-action-buses/nggallery/aec-swift") |
Barry Drive (talk | contribs) (New AOA) |
||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center |[[File: | ! colspan="3" align=center |[[File:T001.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| | ! colspan="3" align=center bgcolor=#CCCCFF| Tram 001 | ||
|- | |- | ||
| valign=top | '''Chassis''' | | valign=top | '''Chassis''' | ||
| [[:Category: | | [[:Category:CAF Urbos 100|CAF Urbos 100]] | ||
|- | |- | ||
| valign=top | '''Depot''' | | valign=top | '''Depot''' | ||
| | | [[:Category:Mitchell Tram Depot|Mitchell]] | ||
|- | |- | ||
| '''Status''' | |||
| | | In service | ||
|- | |- | ||
| '''Build Date''' | |||
| | | Nov 2017 | ||
|- | |- | ||
| '''Delivered''' | |||
| | | 13 December 2017 | ||
|- | |- | ||
| valign | | '''Entered Service''' | ||
| | | 20 April 2019 | ||
<!-- |- | |||
| valign-top | '''Serial Number''' | |||
| -- --> | |||
|- | |- | ||
| valign=top | ''' | | valign=top | '''Capacity''' | ||
| | | 66 seated, 207 total | ||
|- | |- | ||
| valign=top | '''Gallery Album''' | | valign=top | '''Gallery Album''' | ||
| [http://www.actbus.net/gallery- | | [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-001 Tram 001] | ||
|} | |} | ||
| [[TRAM 002|next >>]] | |||
[[File:WC.jpg|25px|link=]]² | |||
| | [[File:CC.jpg|25px|link=]] | ||
|''' | [[File:Wifi.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | |||
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | |||
==Notes== | ==Notes== | ||
* | * Tram 001 was the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail. | ||
* It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017. | |||
* On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave. | |||
** [https://citynews.com.au/2019/canberra-first-man-struck-by-tram/ City News] | |||
** [https://www.canberratimes.com.au/national/act/man-hit-by-canberra-tram-while-walking-through-intersection-20190309-p512ww.html The Canberra Times] | |||
** [https://www.abc.net.au/news/2019-03-09/man-struck-by-light-rail-vehicle-in-central-canberra/10886274 ABC News] | |||
==All Over Advertising== | |||
[[File:Photo.png|link=]] '''Check in CBR (ACT Health)''' – ''3 May 2021 to 4 February 2022'' | |||
[[File:NoPhoto.jpg|link=]] '''Floriade 2022''' – ''18 August 2022 to current'' | |||
==Media== | |||
[[File:video.png|link=]] [https://youtu.be/Dgizr98K7z8 Canberra's Light Rail Vehicle Journey (1:28)] – YouTube <br> | |||
[[File:video.png|link=]] [https://youtu.be/YJ_WaOFdG3I Canberra's First Light Rail Vehicle Arrives (1:17)] – YouTube | |||
[[Category: | [[Category:Canberra Metro Trams]] | ||
[[Category: | [[Category:CAF Urbos 100]] | ||
[[Category:Mitchell Tram Depot]] | |||
[[Category:Class Leaders]] | |||
[[Category:Delivered December 2017]] | |||
[[Category:YouTube]] | |||
[[Category:Current AOA Trams]] |
Revision as of 18:35, 19 August 2022
Tram 001 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Build Date | Nov 2017 | |
Delivered | 13 December 2017 | |
Entered Service | 20 April 2019 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 001 |
| next >>
² ⁴
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Tram 001 was the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail.
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017.
- On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave.
All Over Advertising
Check in CBR (ACT Health) – 3 May 2021 to 4 February 2022
Floriade 2022 – 18 August 2022 to current
Media
Canberra's Light Rail Vehicle Journey (1:28) – YouTube
Canberra's First Light Rail Vehicle Arrives (1:17) – YouTube