Road network changes: Difference between revisions

From ACT Bus Network Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
This page outlines such instances.  
This page outlines such instances.  


==== Road closures and realignments ====
=== Road closures and realignments ===
{| class="wikitable sortable"
{| class="wikitable sortable"
|+
|+
Line 27: Line 27:
|}
|}


==== Renamed roads ====
=== Renamed roads ===
{| class="wikitable sortable"
{| class="wikitable sortable"
|+
|+

Revision as of 12:23, 15 March 2025

Route directions used on this Wiki reflect the road network at the time the route was in effect. In the years since, it may no longer be possible to replicate the exact routes due to road closures or realignments due to construction works. In other cases, roads have been renamed.

This page outlines such instances.

Road closures and realignments

Suburb Street Explanation
Phillip Callam St The southern end of Callam St was realigned to intersect with Athllon Dr instead of Botany St.
Phillip Corinna St
Mitchell Hoskins St Prior to completion of Gungahlin Dr through to Barton Hwy, it swept to the left before essentially joining the current alignment of Well Station Dr, before taking a hard right to join the current alignment.
Russell Russell Dr Road closed between Constitution Ave and west of Reg Saunders Way for construction

Renamed roads

Suburb Previous name Current name
Greenway Scollay St (between Pitman St and Cowlishaw St) Holwell St
City Ballumbir St Cooyong St
Giralang William Slim Dr Gundaroo Dr